Roadmap publik

Apa yang sudah selesai, sedang berjalan, dan rencana berikutnya

Terakhir diperbarui November 10, 2026. Roadmap ini disusun secara jujur berdasarkan bukti verifikasi: rencana masa depan tidak ditampilkan seolah-olah sudah selesai.

Prioritas produk

P0

Trustworthy foundations

Complete

Production source, links, tests, and the tagged Netlify release are verified.

6 dari 6 target selesai

P1

Complete beginner journey

Complete

The free four-lesson track, labs, starter files, capstone, help path, and consented progress tracking are verified.

5 dari 5 target selesai

P2

Indonesia Emas 2045 pilot

Complete

The campaign is transformed into a concrete program brief, MSME/community pilot project, and public participation path.

3 dari 3 target selesai

P3

Welcoming open source

Complete

Beginner-ready project curation, tested local setups, contribution guides, and the learning-track-to-repository index are verified.

3 dari 3 target selesai

P4

Creator and community operations

Complete

Bi-weekly editorial cadence, learning-track curriculum articles, GitHub Discussions feedback paths, and consent-first showcase rules are operational.

3 dari 3 target selesai

P5

Measure meaningful outcomes

Complete

Monthly outcome review cycle, continuous curriculum tuning, CTA integrity governance, and strict data boundary policies are fully operational.

3 dari 3 target selesai

P6

Institutional-grade web experience

Complete

The new positioning, dual-audience experience, core information architecture, design system, trust foundations, bilingual route parity, production pilot bot, terminology validation, and user journey testing are verified.

9 dari 9 target selesai

P7

Blogspot archive migration

Complete

All 229 legacy posts imported into the /id/blog library with self-hosted images and 301 redirects; two curated near-duplicate pairs merged into canonical posts; 227 final routes are SSG, sitemap-covered, and test-verified.

4 dari 4 target selesai

Arah jangka panjang

  1. 2026

    Fondasi platform dan pilot pembelajaran awal

    Sedang berjalan
  2. 2027

    Pilot sekolah dan komunitas; pengembangan jaringan mentor

    Direncanakan
  3. 2028

    Ekspansi regional dan kemitraan kelembagaan

    Direncanakan
  4. 2029+

    Penerapan program berskala luas, ekosistem belajar terbuka, dan kolaborasi internasional

    Direncanakan

Fokus saat ini

P7 Blogspot archive migration is complete: 227 posts publish to /id/blog, legacy permalinks 301-redirect, and two near-duplicate pairs merge into canonical posts.

Langkah berikutnya

Cut the tagged release carrying P7, point blog.programinglive.com DNS at the Netlify site, and retire the Blogger property.

Lihat dokumen roadmap kode sumber di GitHub ↗